Skip to main content
On the Roadmap

Include All Scheduled Intent Execution Results in Runbook Document

Related products:Map
  • August 8, 2026
  • 0 replies
  • 3 views

Forum|alt.badge.img+3

NetBrain currently does not populate the Runbook Document with results from all scheduled executions of an Intent when that Intent is configured to run multiple times at a defined interval; only the first execution's result is captured, even when the 'Last results' or time-window based result settings are configured. This enhancement would update Runbook Document generation to honor the configured result retention settings and include the results from every scheduled execution of the Intent, consistent with how manual multi-run executions are already captured. Providing complete execution history in the document would give operations teams full visibility into all scheduled diagnostic results for review, reporting, and audit purposes.